ecg logoecg taglineecg top
 
Patchogue UFSD


Project Size:
$3.7 million
Completion Status- est. March 2011
.................................................
Annual Energy Savings: $205,790
Reduction in Energy Costs: 34%

.................................................

The New Paltz CSD brought in ECG after initially attempting to conduct an RFP for an energy project in-house. ECG prepared an amended RFP and solicited three competitive proposals from qualified ESCO’s, evaluated said proposals and assisted the District in the selection process. After the selection process the District added additional buildings to the project and received specialized engineering services from ECG to solve an immediate heating plant problem.

Project Highlights

  • lighting upgrades
  • lighting controls/occupancy sensors
  • weatherization
  • destratification fans
  • energy management system (EMS)
  • insulate steam pipe and valves
  • boiler/burner replacement
  • boiler controllers
  • solar thermal hot water
  • waste oil heater
  • high efficiency motors/variable frequency drives
  • computer power management
  • kitchen foot pedals/hot water conserving faucets
  • thermostatic radiator valves
  • kitchen hood exhaust controls
  • vending machine controls
  • photovoltaic (solar) panels
  • air handler refurb/replacement
  • ceiling install
  • wind turbine
  • bus block heaters
  • cogged v-belts

Back to Portfolio Page

Half Hollow Hills


Half Hollow Hills

 

 

 
 
© ECG Engineering - All Rights Reserved 2010