THE ECG GROUP: PROJECTS
New Paltz School District, NY

Project Size: $4 Million
Cash Flow: $1.7 Million
Total Value: $5.7 Million
Completed: December 2012
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $205,790
Reduction in Energy Costs: 34.0%

.................................................

Project Description
The New Paltz CSD brought in ECG after initially attempting to conduct an RFP for an energy project in-house. ECG prepared an amended RFP and solicited three competitive proposals from qualified ESCO’s, evaluated said proposals and assisted the District in the selection process. After the selection process the District added additional buildings to the project and received specialized engineering services from ECG to solve an immediate heating plant problem.

Project Highlights

  • lighting upgrades
  • lighting controls/occupancy sensors
  • weatherization
  • destratification fans
  • energy management system (EMS)
  • insulate pipe
  • boiler repiping
  • boiler controllers
  • solar thermal hot water
  • high efficiency motors/variable frequency drives
  • computer power management
  • thermostatic radiator valves
  • kitchen hood exhaust controls
  • walk-in freezer replacements
  • attic insulation
  • steam trap replacements
  • high efficiency transformers
  • bus block heaters
  • cogged v-belts
  • unit ventilator replacements