Project Size: $10.6 million
Completion Status- October 2009
.................................................
Annual Energy Savings: $323,345
Reduction in Energy Costs: 38.7%

.................................................

After a highly publicized tumultuous capital project left Mahopac CSD with numerous indoor air quality issues and faulty mechanical systems, the district turned to energy performance contracting (EPC) to rectify some of the issues.

After evaluating the district’s energy cost and consumption data to confirm they had an opportunity for an EPC, ECG Engineering, LLC. customized an RFP for the district that would focus the responding Energy Services Companies (ESCOs) on the district’s specific priorities.

As a result, the proposals that were received contained several creative approaches to correcting the problems created during the prior bond issue. The district is now contracted with an ESCO to receive over $10 million in facility upgrades at no out-of-pocket cost.

Project Highlights

  • lighting system upgrades
  • boiler plant replacements
  • energy management  systems
  • replacement of unit ventilators
  • exhaust fans and dampers
  • boiler controllers
  • steam trap replacements
  • variable speed drives
  • vending machine controls
  • computer power management
  • weather stripping and sealing
  • attic insulation
  • installation of new windows
  • window film
  • photovoltaic system