Levittown School District, NY

Project Size: $10.9 Million
Cash Flow: $4.5 Million
Total Value: $ 15.4 Million
Completion Date: April 2017
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings:$597,386
Reduction in Energy Costs: 30%

.................................................

Project Description
The Levittown School District approached ECG after receiving an energy audit through a state-sponsored program. The District wanted to see if additional saving opportunities could be uncovered through a traditional Energy Performance Contract (EPC). The result was an EPC that was three times the size of the audit’s scope of work, and a project that is not only tax- and budget-neutral but will also produce an annual positive cash flow.

Project Highlights

  • Lighting System Upgrades
  • Lighting Controls - Occupancy Sensors
  • Exterior Lighting
  • Energy Management System Upgrades
  • Premium Efficiency Motors & Pool Pumps
  • Steam Trap Replacement
  • Building Envelope Improvements
  • Water Conservation
  • Window Film
  • Boiler Upgrades
  • Boiler Controllers
  • Waste Oil Furnace
  • Fuel Catalyzer Installation
  • Pipe Insulation
  • Kitchen Hood – Exhaust Fan DDC Control
  • Solar Photovoltaic System
  • Block Heater Controls
  • Energy Efficient Transformers
  • Unit Ventilator Refurbishment
  • Vending Misers
  • A/C Compressor Controllers
  • Refrigeration Compressor Controllers
  • Refrigeration Equipment Upgrade