Project Size:
$11.2 million
Completion Status- January 2012
.............................................
Annual Energy Savings: $610,842
Reduction in Energy Costs: 27%
.............................................
Back in 2006, administrators at Connetquot CSD made the
decision to thoroughly evaluate their district’s potential
for an Energy Performance Contract (EPC). Although all involved
suspected an opportunity existed for a reasonably-sized EPC,
no one knew the magnitude of what the district would be able
to accomplish – from both financial and infrastructure
perspectives – through this process.
Today, the district is engaged in an EPC that will bring
over $11 million worth of facility upgrades and give the
district a substantial annual positive cash flow. All this
will be achieved with zero taxpayer
impact.
Project Highlights
- lighting system upgrades
- occupancy sensors
- integrated building energy management system
- boiler controllers
- steam trap replacement
- thermostatic radiator valve installation
- transformer replacement
- replacement of single glazed windows and doors at the
Oakdale-Bohemia MS, Ronkonkoma Jr. HS and District
Office
- solar pool heating system for HS
- conversion of district office HVAC system to water source
heat pumps
|