Connetquot CSD

Project Size: $11.2 million
Completion Status- January 2012
.............................................
Annual Energy Savings: $610,842
Reduction in Energy Costs: 27%

.............................................

Back in 2006, administrators at Connetquot CSD made the decision to thoroughly evaluate their district’s potential for an Energy Performance Contract (EPC). Although all involved suspected an opportunity existed for a reasonably-sized EPC, no one knew the magnitude of what the district would be able to accomplish – from both financial and infrastructure perspectives – through this process.

Today, the district is engaged in an EPC that will bring over $11 million worth of facility upgrades and give the district a substantial annual positive cash flow. All this will be achieved with zero taxpayer impact.

Project Highlights

  • lighting system upgrades
  • occupancy sensors
  • integrated building energy management system
  • boiler controllers
  • steam trap replacement
  • thermostatic radiator valve installation
  • transformer replacement
  • replacement of single glazed windows and doors at the Oakdale-Bohemia MS, Ronkonkoma Jr. HS and District Office
  • solar pool heating system for HS
  • conversion of district office HVAC system to water source heat pumps

 