ECG ENGINEERING: PROJECTS
Commack School District, NY

Project Size: $17.2 Million
Cash Flow: $8.6 Million
Total Value: $25.8 Million
Completed: March 2014
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $965,482
Reduction in Energy Costs: 37.1%

.................................................

Project Description
Although the Commack School District had maintained and improved its facilities consistently over the years, many energy consuming systems, such as lighting and energy management systems, had not been upgraded. As a result, a large energy savings opportunity existed, which enabled the District to receive over $17 million worth of facility improvements and a large annual positive cash flow. Commack School District’s Energy Performance Contract will bring state-of-the-art, efficient systems to the District, reducing its current energy spend by 37%.

Project Highlights

  • lighting system upgrades
  • lighting controls - occupancy sensors
  • weatherization
  • energy management system upgrades
  • pipe and valve insulation
  • boiler domestic hot water controllers
  • roof replacement
  • window/door/panel replacements
  • window lm• computer power management
  • kitchen hood control
  • transformer replacement
  • cogeneration
  • compressed air system replacements
  • hot water conserving faucets/pedal valves
  • walk-in freezer controllers
  • walk-in freezer refurb./replacement
  • vending machine controls
  • boiler/burner replacements
  • rooop air handler unit/condenser unit replace-ment
  • chiller replacement
  • domestic hot water heater replacements
  • high eciency/variable frequency drives

 

  Back to Portfolio Page