Project Size: $10.2 million
Completion Status- est. November 2011
.................................................
Annual
Energy Savings: $695,608
Reduction in Energy Costs: 37%
.................................................
In 2008, Administrators at Central Islip UFSD sought to complement their EXCEL project with a multitude of energy saving measures through the Energy Performance Contracting (EPC) process. The result was an EPC that will upgrade 21 energy consuming systems district-wide, plus provide energy-generating equipment such as solar and wind power, at no cost to the district. The project will reduce the district’s energy spending by 33% and greatly improve the learning environment for its students.
Project Highlights
- lighting upgrades/occupancy sensors
- weatherization
- roof and wall insulation
- energy management system (EMS)
- insulate steam pipe and valves
- repair feedwater tank
- boiler controllers
- window film
- computer power management
- steam traps
- wireless clock system
- on- demand DHW replacement
- unit ventilator controls relocate/reconfigure
- window/door/panel replacement
- kitchen foot pedals
- kitchen hood exhaust controls
- photovoltaic (solar) panels
- premium efficiency/variable frequency motors
- swimming pool cover
- replace radiant floor with unit ventilators
- wind power