Central Islip School District, NY

Project Size: $11.8 Million
Cash Flow: $3.2 Million
Total Value: $15 Million
Completed: March 2013
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $695,608
Reduction in Energy Costs: 37.0%

.................................................

Project Description
In 2008, Administrators at Central Islip UFSD sought to complement their EXCEL project with a multitude of energy saving measures through the Energy Performance Contracting (EPC) process.

The result was an EPC that will upgrade 21 energy consuming systems district-wide, plus provide energy-generating equipment such as solar power, at no cost to the district. The project will reduce the district’s energy spending by 37% and greatly improve the learning environment for its students.

Project Highlights

  • lighting upgrades/occupancy sensors
  • weatherization
  • attic insulation
  • energy management system (EMS)
  • insulate steam pipe and valves
  • replace feedwater tank
  • boiler controllers
  • window film
  • computer power management
  • steam traps
  • wireless clock system
  • on- demand domestic hot water replacement
  • window replacement
  • kitchen foot pedal valves
  • kitchen hood exhaust controls
  • photovoltaic (solar) panels
  • premium efficiency motor