THE ECG GROUP: PROJECTS
Bayport-Blue Point School District, NY

Project Size: $4.4 Million
Cash Flow: $2.8 Million
Total Value: $7.2 Million
Completed: June 2015
Project Description:
Energy Performance Contract

.................................................
Annual Energy Savings: $279,269
Reduction in Energy Costs: 29.0%

.................................................

Project Description
Having experienced great success with Energy Performance Contracting at previous Districts, Administrators at the Bayport-Blue Point School District once again turned to an Energy Performance Contract as an alternative funding mechanism for energy-related building needs. As a result, District residents will receive over $8 Million worth of value from the project, including new windows, a boiler replacement, door replacements and an annual positive cash flow.

Project Highlights

  • lighting upgrades and controls
  • occupancy sensors
  • energy management system upgrades
  • high efficiency/variable frequency drives
  • computer power management
  • weatherization
  • boiler replacement
  • steam trap replacement
  • kitchen pedals/low-flow faucets
  • window replacement
  • kitchen hood exhaust controls
  • boiler controllers
  • photovoltaic (solar) panels
  • HVAC return installation
  • door replacement
  • vending machine controls
  • transformer replacements \
  • destratification fans
  • insulate pipe/valves
  • unit ventilators refurb./replacement